Opening a New Site: A Traffic Safety Checklist Before Day One

Download the checklist (Word) (DOCX · 13 KB) · Download the checklist (PDF) (PDF · 34 KB)

What does the law ask for at a new site?

Three duties matter most for vehicles and people on foot:

What should be in place before day one?

The free one-page checklist on this page (Word or PDF) covers everything in this section, with space for who and by when.

Design (the strongest controls, and cheapest now)

Paperwork that matches this site

People

What should you check in the first weeks?

A new site never runs exactly as drawn. People find shortcuts, deliveries arrive at times nobody planned for, and the busiest hour turns out to be a different one.

  1. Watch real operations. Busy hours, shift changes and the first night shift, not a quiet afternoon.
  2. Look for desire lines. Worn paths and gaps in barriers show where people actually walk.
  3. Read every near miss. In the first weeks they show where the design is not working.
  4. Fix the layout while it is easy. Moving a barrier in week two costs little. In year two it means rewriting the routine everyone has got used to.
  5. Then make it routine. A monthly transport safety check keeps watching once things settle.

A new site is the one time the layout is still cheap to change. Use the first weeks to find out where it is wrong.

What does a pre-opening review look like?

Site: a new distribution centre with 20 loading doors, four counterbalance forklifts and a staff car park on the far side of the yard. Opening in three weeks.

What the walk found Fix before opening Who, by when
The only walkway from the car park crosses the lorry turning area Fenced walkway along the yard edge, with a crossing at a straight stretch Project manager, 2 weeks
Lorries must reverse twice to reach doors 18 to 20 One-way route clockwise round the building Project manager, 2 weeks
No set place for drivers during loading Drivers' waiting room by the gatehouse; keys handed in at the gate Site manager, before opening
The yard is dark between the lighting columns at the far end Two extra lights, checked after dark Facilities, 1 week

Two weeks after opening, the site reviewed its near-miss reports and the walkway use, and moved one crossing to where people were actually walking.

Common questions

Do I need a new risk assessment for a new site?

Yes. The Management of Health and Safety at Work Regulations 1999 require the assessment to be reviewed if there has been a significant change, and a new site is one. The old site's assessment can be a starting point, but the layout, routes and vehicles will differ.

What does the law say about traffic routes at work?

Regulation 17 of the Workplace (Health, Safety and Welfare) Regulations 1992 says every workplace must be organised so pedestrians and vehicles can circulate safely, with routes suitable for those using them and sufficient separation where vehicles and pedestrians share a route.

Do I need a traffic management plan for a new warehouse?

There is no law that names a "traffic management plan". But you must assess and control workplace transport risks, and a written plan, drawn on the site map, is the clearest way to show how you do it. Our traffic management plan template is free.

What is the most effective way to protect pedestrians on a new site?

Separating them from vehicles, ideally on entirely separate routes. HSE's workplace transport guide calls this the most effective way of protecting them. A new site is the easiest time to do it.

When should we review the layout after opening?

Watch it closely in the first weeks, including a night shift and the busiest hours, and review it after the first month using near-miss reports and what you saw. Then check regularly, for example monthly.

References

A layout works on the drawing. Do you know how it works in week one, on the night shift? Safety Mapping: a free two-week trial on one camera.

By Hao Zheng, CEO at RoboK · Last checked November 2026